Silver Storm drills 436 g/t Ag.Eq over 4.5 m, approximately 97 m under last stope in Norte-Sur Zone

Toronto, Ontario, November 21, 2023: Silver Storm Mining Ltd. (“Silver Storm” or the "Company") (TSX.V: SVRS | OTCQB: SVRSF | FSE: SVR), is pleased to announce the second set of drill results from its Phase 1 diamond drilling program at the Company’s 100% owned La Parrilla Silver Mine Complex, located in Durango Mexico. Results from the two holes within this release are from the Quebradillas mine.

Key highlights include:

• Hole Q-23-007 successfully intersected the Norte-Sur zone returning 436 g/t Ag.Eq1 over 4.46 metres (“m”) and 330 g/t Ag.Eq over 2.26 m within a broader interval grading 324 g/t Ag.Eq over 8.72 m.

• This intercept is located approximately 97 m below the last mine development in this area, with similar high-grade mineralization:

- Level 1749 graded 358 g/t Ag.Eq over a strike length of 51 m and width of 3.6 m

- Level 1737 graded 407 g/t Ag.Eq over a strike length of 28 m and width of 3.2 m

• Hole Q-23-007 also successfully intersected a new zone returning 357 g/t Ag.Eq over 1.77 m, including a strong gold intercept of 4.07 g/t Au.

• Hole Q-23-006 successfully intersected a new zone of replacement mineralization returning 1,085 g/t Ag.Eq over 0.82 m and 633 g/t Ag.Eq over 0.44 m.

Download press release
Previous
Previous

Silver Storm To Present At The Clean Energy AND Precious Metals Virtual Investor Conference

Next
Next

Silver Storm To Attend 121 Mining Investment London Conference