Silver Storm Drills 500 G/T Ag.Eq Over 14.8 M In C1524 Zone

Toronto, Ontario, December 5, 2023: Silver Storm Mining Ltd. (“Silver Storm” or the "Company") (TSX.V: SVRS | OTCQB: SVRSF | FSE: SVR), is pleased to announce the third set of drill results from its Phase 1 diamond drilling program at the Company’s 100% owned La Parrilla Silver Mine Complex, located in Durango Mexico. Results from the five holes within this release are from the Quebradillas mine.

Key highlights include:

• Hole Q-23-010 intersected the C1524 Zone, returning 650 g/t Ag.Eq1 over 7.14 metres (“m”) and 607 g/t Ag.Eq over 4.36 m, including 1,251 g/t Ag.Eq over 1.51 m, all within a broader interval grading 500 g/t Ag.Eq over 14.8 m.

• This intercept is located approximately 37 m below the last mine development in this area, with similar high-grade mineralization:

  • 1808 EL composited historic channel samples graded 329 g/t Ag.Eq over a strike length of 36 m and width of 1.13 m.

  • 1822 EL composited historic channel samples graded 258 g/t Ag.Eq over a strike length of 28 m and width of 1.51 m.

• Hole Q-23-011 intersected the C1524B Zone, returning 802 g/t Ag.Eq over 1.11 m.

• Holes Q-23-012 & Q-23-009 intersected the C1524 Zone, returning 281 g/t Ag.Eq over 0.45 m & 126 g/t Ag.Eq over 1.00 m respectively.

• Hole Q-23-008 intersected the Norte-Sur zone of breccia & replacement mineralization returning 506 g/t Ag.Eq over 0.68 m, 30 m up-dip from hole Q-23-007, which returned 324 g/t Ag.Eq over 8.72 m.

Next
Next

Silver Storm To Present At The Clean Energy AND Precious Metals Virtual Investor Conference