Silver Storm Drills 1,810 g/t Ag.Eq Over 14.6 m In C460 Zone

Toronto, Ontario, January 04, 2024: Silver Storm Mining Ltd. (“Silver Storm” or the "Company") (TSX.V: SVRS | OTCQB: SVRSF | FSE: SVR), is pleased to announce further drill results from its Phase 1 diamond drilling program at the Company’s 100% owned La Parrilla Silver Mine Complex, located in Durango Mexico. Results from the four holes within this release are from the Quebradillas mine.

Key highlights include:

• Hole Q-23-020 intersected the C460 Zone returning 1,810 g/t Ag.Eq1 over 14.62 metres (“m”) including 2,466 g/t Ag.Eq1 over 9.57 m and 682 g/t Ag.Eq over 4.00 m.

• This intercept is located approximately 15 m below the last mine development in this area, with similar high-grade mineralization:

- 1767 EL composited historical channel samples graded 974 g/t Ag.Eq over a strike length of 23 m and width of 2.86 m.

• Hole Q-23-017 intersected the Quebradillas Zone returning 266 g/t Ag.Eq. over 6.03 m including 496 g/t Ag.Eq over 1.67 m and 354 g/t Ag.Eq over 0.60 m.

• Hole Q-23-019 intersected the Quebradillas Zone returning 523 g/t Ag.Eq over 1.22 m.

Previous
Previous

Silver Storm To Present At The 2024 Vancouver Resource Investor Conference